VANCOUVER, British Columbia, Dec. 05, 2022 (GLOBE NEWSWIRE) — Eldorado Gold Corporation (“Eldorado” or “the Company”) today releases its updated Mineral Reserve and Mineral Resource (“MRMR”) estimates as of September 30, 2022.

The Company’s total MRMR is adjusted for the planned divestment of its non-core Romanian asset (Certej), which is consistent with the Company’s strategy of focusing on core jurisdictions in its portfolio.


Mineral Reserves Update

Net of divestitures, the Company’s Proven and Probable gold Reserves (“2P Reserves”), totalled 12.3 million ounces as of September 30, 2022

(1)

, a decrease of approximately 4% from the previous MRMR statement as of September 30, 2021. Excluding depletion, the 2P Reserves year over year remained relatively flat. The complete table of Mineral Resources and Mineral Reserves can be found at the end of this release.


() See “Mineral Reserve Notes” below.


Total 2P Reserves



(Gold Ounces x 1,000)
Proven and Probable in-situ gold ounces as of September 30, 2021 15,264
Depletion

(


1)
-597
Adjustments for metal prices, cut-off value and mine plan optimization 46

Net Proven and probable in-situ gold ounces as of September 30, 2022

14,714
Certej Divestment

(


2


)
-2,402

Proven and probable in-situ gold ounces as of September 30, 2022

12,312

NOTE: Numbers may not down-add due to rounding.

(1)

Depletion declared here are in-situ ounces. Depletion includes Q4 2021 and Q1-Q3 2022.

(2)

In October 2022, Eldorado entered into an agreement to sell the Certej project, a non-core asset. The transaction is expected to close in Q1 2023.


Net of divestitures, and excluding depletion, the small change in Proven and Probable Reserves is attributable to conversion of Resources to Reserves in the Kokarpinar zone at Efemcukuru and infill drilling in the Upper Triangle zone at Lamaque. These gains were mostly offset by adjustments for cut-off value, metal prices and mine plan optimization at Olympias.

The following table summarizes the year-over-year changes to the Company’s gold Reserves:


Proven and Probable Reserves

2021

2022

Change



(




1)



Change excluding depletion

Contained Au Oz (x1,000)
Efemcukuru 620 542 -13 % 4 %
Kisladag 4,282 4,069 -5 % 0 %
Lamaque 1,091 985 -10 % 7 %
Olympias 1,990 1,836 -8 % -3 %
Perama Hill 1,250 1,250
Skouries 3,630 3,630
Certej 2,402 0 -100 %

Total

15,264

12,312

-19

%

-15

%
Less divestitures:

(


2


)
Certej 2,402

Gross Total

12,862

12,312

-4

%

<1%

NOTE: Numbers may not down-add due to rounding.

(1)

The Company reports on MRMR as of September 30, 2022. As such the change year over year, is from September 30, 2021 to September 30, 2022.

(2)

In October 2022, Eldorado entered into an agreement to sell the Certej project, a non-core asset. The transaction is expected to close in Q1 2023.



Mineral Resources


Update

Eldorado’s Measured and Indicated (“M+I”) Resources totalled 19.2 million ounces, net of divestitures

(


1)

, as of September 30, 2022. This is a 2% decrease from the previous MRMR statement on September 30, 2021, attributable to decreases at Kisladag, Lamaque and Olympias. Eldorado’s Inferred Resources totalled 7.7 million ounces as of September 30, 2022, a 3% increase from the previous MRMR statement on September 30, 2021, net of divestitures.


(1)


The Company elected to allow the Bolcana exploration license to expire in 2021, and as such the applicable Mineral Resources have been removed from the Company’s Mineral Resources statement.

  • Efemcukuru: The decrease in Inferred Resources is attributable to the upgrade to M+I Resources at Bati and Kokarpinar, through resource conversion drilling, which demonstrates increasing geological confidence in the ore bodies, and removing isolated areas of M+I Resources that are not expected to enter the future mine plan.
  • Lamaque: The Inferred Resource increased substantially due to geological model updates. The M+I decrease is attributable to depletion, partially offset by upgrades of Inferred Resources.
  • Ormaque: The Inferred Resource increased to reflect the new Technical Study released in February 2022. As previously announced in the October 2022 exploration update, the resource conversion drilling program at Ormaque commenced in June 2022 and will continue through 2023, targeting the upper two-thirds of the deposit. Results from this resource conversion drilling program, up to mid-2023, are expected to be reflected in the Company’s 2023 MRMR statement.

The following table summarizes the year-over-year changes to the Company’s gold Resources:


Total Measured and Indicated Resources


Inferred Resources

2021

2022

Change



(




1)



2021

2022

Change



(




1)


Contained Au



ounces (x1000)

Contained Au



ounces (x1000)
Efemcukuru 1,066 1,069 <1% 629 431 -31 %
Kisladag 6,822 6,603 -3 % 107 107 0 %
Lamaque 1,937 1,806 -7 % 1,962 2,354 20 %
Ormaque 0 0 803 839 4 %
Olympias 3,409 3,329 -2 % 566 560 -1 %
Perama Hill 1,374 1,374 59 59
Perama South 0 0 728 728
Piavitsa 0 0 1,025 1,025
Sapes 0 0 820 820
Skouries 5,030 5,030 814 814
Certej 3,829 0 -100 % 23 0 -100 %
Bolcana 0 0 6,492 0 -100 %

Total

23,467

19,210

-18

%

14,028

7,737

-45

%
Less divestitures:

(


2


)
Certej 3,829 23
Bolcana 6,492

Gross Total

19,683

19,210

-2

%

7,513

7,737

3

%

NOTE: Numbers may not down-add due to rounding.

(1)

The Company Reports on MRMR as of September 30, as such the change year over year, is from September 30, 2021 to September 30, 2022.

(2)

In October 2022, Eldorado entered into an agreement to sell the Certej project, a non-core asset. The transaction is expected to close in Q1 2023. The Company also elected to allow the Bolcana exploration license to expire in 2021, and as such the applicable Mineral Resources have been removed from the Company’s Mineral Resources statement.



About Eldorado Gold

Eldorado is a gold and base metals producer with mining, development and exploration operations in Turkiye, Canada and Greece. The Company has a highly skilled and dedicated workforce, safe and responsible operations, a portfolio of high-quality assets, and long-term partnerships with local communities. Eldorado’s common shares trade on the Toronto Stock Exchange (TSX: ELD) and the New York Stock Exchange (NYSE: EGO).


Contact


Investor Relations

Lisa Wilkinson, VP, Investor Relations

604.757 2237 or 1.888.353.8166


[email protected]


Media

Louise McMahon, Director Communications & Public Affairs

604.757 5573 or 1.888.353.8166


[email protected]




Eldorado Gold Mineral Reserves, as of September 30, 2022



Project



Proven Mineral Reserves



Probable Mineral Reserves



Total Proven and Probable



Gold


Tonnes

Au

Contained Au

Tonnes

Au

Contained Au

Tonnes

Au

Contained Au

(x1000)

g/t

ounces (x1000)

(x1000)

g/t

ounces (x1000)

(x1000)

g/t

ounces (x1000)

Efemcukuru
1,567 5.59 282 1,617 5.01 260 3,184 5.30 542

Kisladag
173,443 0.69 3,856 12,563 0.53 213 186,006 0.68 4,069

Lamaque
877 6.82 192 3,753 6.57 793 4,630 6.62 985

Olympias
1,583 9.31 474 6,660 6.36 1,362 8,243 6.93 1,836

Perama Hill
3,088 4.03 400 9,410 2.81 850 12,498 3.11 1,250

Skouries
73,101 0.87 2,053 74,015 0.66 1,576 147,116 0.77 3,630

TOTAL GOLD

253,660

0.89

7,257

108,017

1.46

5,055

361,677

1.06

12,312


Silver


Tonnes

Ag

Contained Ag

Tonnes

Ag

Contained Ag

Tonnes

Ag

Contained Ag

(x1000)

g/t

ounces (x1000)

(x1000)

g/t

ounces (x1000)

(x1000)

g/t

ounces (x1000)

Olympias
1,583 136 6,937 6,660 132 28,157 8,243 132 35,094

Perama Hill
3,088 4 403 9,410 8 2,277 12,498 7 2,680

TOTAL SILVER

4,671

49

7,340

16,070

59

30,434

20,741

57

37,774


Copper


Tonnes

Cu

Contained Cu

Tonnes

Cu

Contained Cu

Tonnes

Cu

Contained Cu

(x1000)

%

tonnes (x1000)

(x1000)

%

tonnes (x1000)

(x1000)

%

tonnes (x1000)

Skouries
73,101 0.52 381 74,015 0.48 359 147,116 0.50 740

TOTAL COPPER

73,101

0.52

381

74,015

0.48

359

147,116

0.50

740


Lead


Tonnes

Pb

Contained Pb

Tonnes

Pb

Contained Pb

Tonnes

Pb

Contained Pb

(x1000)

%

tonnes (x1000)

(x1000)

%

tonnes (x1000)

(x1000)

%

tonnes (x1000)

Olympias
1,583 4.4 70 6,660 4.5 300 8,243 4.5 369

TOTAL LEAD

1,583

4.4

70

6,660

4.5

300

8,243

4.5

369


Zinc


Tonnes

Zn

Contained Zn

Tonnes

Zn

Contained Zn

Tonnes

Zn

Contained Zn

(x1000)

%

tonnes (x1000)

(x1000)

%

tonnes (x1000)

(x1000)

%

tonnes (x1000)

Olympias
1,583 5.0 79 6,660 5.4 360 8,243 5.3 439

TOTAL ZINC

1,583

5.0

79

6,660

5.4

360

8,243

5.3

439


Eldorado Gold Mineral Reserves, as of September 30, 2021



Project



Proven Mineral Reserves



Probable Mineral Reserves



Total Proven and Probable



Gold


Tonnes

Au

Contained Au

Tonnes

Au

Contained Au

Tonnes

Au

Contained Au

(x1000)

g/t

ounces (x1000)

(x1000)

g/t

ounces (x1000)

(x1000)

g/t

ounces (x1000)

Certej
22,788 1.93 1,414 21,500 1.43 988 44,288 1.69 2,402

Efemcukuru
1,732 6.03 336 1,645 5.37 284 3,377 5.71 620

Kisladag
183,092 0.69 4,061 12,819 0.54 221 195,911 0.68 4,282

Lamaque
502 8.02 129 4,154 7.20 962 4,656 7.29 1,091

Olympias
1,205 10.87 421 8,132 6.00 1,569 9,337 6.63 1,990

Perama Hill
3,088 4.03 400 9,410 2.81 850 12,498 3.11 1,250

Skouries
73,101 0.87 2,053 74,015 0.66 1,576 147,116 0.77 3,630

TOTAL GOLD

285,508

0.96

8,814

131,674

1.52

6,450

417,182

1.14

15,264


Silver


Tonnes

Ag

Contained Ag

Tonnes

Ag

Contained Ag

Tonnes

Ag

Contained Ag

(x1000)

g/t

ounces (x1000)

(x1000)

g/t

ounces (x1000)

(x1000)

g/t

ounces (x1000)

Certej
22,788 10 7,004 21,500 12 8,551 44,288 11 15,555

Olympias
1,205 155 6,006 8,132 116 30,422 9,337 121 36,428

Perama Hill
3,088 4 403 9,410 8 2,277 12,498 7 2,680

Stratoni
0 0 0 0 0 0 0 0 0

TOTAL SILVER

27,081

15

13,413

39,042

33

41,250

66,123

26

54,663


Copper


Tonnes

Cu

Contained Cu

Tonnes

Cu

Contained Cu

Tonnes

Cu

Contained Cu

(x1000)

%

tonnes (x1000)

(x1000)

%

tonnes (x1000)

(x1000)

%

tonnes (x1000)

Skouries
73,101 0.52 381 74,015 0.48 359 147,116 0.50 740

TOTAL COPPER

73,101

0.52

381

74,015

0.48

359

147,116

0.50

740


Lead


Tonnes

Pb

Contained Pb

Tonnes

Pb

Contained Pb

Tonnes

Pb

Contained Pb

(x1000)

%

tonnes (x1000)

(x1000)

%

tonnes (x1000)

(x1000)

%

tonnes (x1000)

Olympias
1,205 4.9 59 8,132 4.0 323 9,337 4.1 382

Stratoni
0 0.0 0 0 0.0 0 0 0.0 0

TOTAL LEAD

1,205

4.9

59

8,132

4.0

323

9,337

4.1

382


Zinc


Tonnes

Zn

Contained Zn

Tonnes

Zn

Contained Zn

Tonnes

Zn

Contained Zn

(x1000)

%

tonnes (x1000)

(x1000)

%

tonnes (x1000)

(x1000)

%

tonnes (x1000)

Olympias
1,205 5.6 68 8,132 5.0 410 9,337 5.1 477

Stratoni
0 0.0 0 0 0.0 0 0 0.0 0

TOTAL ZINC

1,205

5.6

68

8,132

5.0

410

9,337

5.1

477


Eldorado Gold Mineral Resources, as of September 30, 2022



Project



Measured Resources



Indicated Resources



Total Measured and Indicated



Inferred Resources



Gold


Tonnes

Au

Contained Au

Tonnes

Au

Contained Au

Tonnes

Au

Contained Au

Tonnes

Au

Contained Au

(x1000)

g/t

ounces (x1000)

(x1000)

g/t

ounces (x1000)

(x1000)

g/t

ounces (x1000)

(x1000)

g/t

ounces (x1000)

Efemcukuru
1,857 7.37 440 2,842 6.88 629 4,699 7.07 1,069 2,677 5.01 431

Kisladag
300,070 0.61 5,895 44,408 0.50 708 344,478 0.60 6,603 7,529 0.44 107

Lamaque
1,125 9.14 331 5,978 7.68 1,475 7,103 7.91 1,806 10,003 7.32 2,354

Ormaque
0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2,223 11.74 839

Olympias
2,618 10.49 883 10,319 7.37 2,446 12,937 8.00 3,329 2,186 7.97 560

Perama Hill
3,093 4.15 412 10,973 2.73 962 14,066 3.04 1,374 1,136 1.63 59

Perama South
0 0.00 0 0 0.00 0 0 0.00 0 14,870 1.52 728

Piavitsa
0 0.00 0 0 0.00 0 0 0.00 0 6,613 4.82 1,025

Sapes
0 0.00 0 0 0.00 0 0 0.00 0 3,434 7.43 820

Skouries
90,714 0.85 2,479 149,260 0.53 2,551 239,974 0.65 5,030 67,657 0.37 814

TOTAL GOLD

399,477

0.81

10,439

223,779

1.22

8,771

623,256

0.96

19,210

118,328

2.03

7,738


Silver


Tonnes

Ag

Contained Ag

Tonnes

Ag

Contained Ag

Tonnes

Ag

Contained Ag

Tonnes

Ag

Contained Ag

(x1000)

g/t

ounces (x1000)

(x1000)

g/t

ounces (x1000)

(x1000)

g/t

ounces (x1000)

(x1000)

g/t

ounces (x1000)

Olympias
2,618 148 12,440 10,319 148 49,212 12,937 148 61,651 2,186 190 13,368

Perama Hill
3,093 4 415 10,973 7 2,579 14,066 7 2,994 1,136 2 83

Piavitsa
0 0 0 0 0 0 0 0 0 6,613 54 11,389

Stratoni
0 0 0 1,351 153 6,647 1,351 153 6,647 1,700 162 8,866

TOTAL SILVER

5,711

70

12,855

22,643

80

58,438

28,354

78

71,292

11,635

90

33,706


Copper


Tonnes

Cu

Contained Cu

Tonnes

Cu

Contained Cu

Tonnes

Cu

Contained Cu

Tonnes

Cu

Contained Cu

(x1000)

%

tonnes (x1000)

(x1000)

%

tonnes (x1000)

(x1000)

%

tonnes (x1000)

(x1000)

%

tonnes (x1000)

Skouries
90,714 0.51 466 149,260 0.44 652 239,974 0.47 1,118 67,657 0.40 267

TOTAL COPPER

90,714

0.51

466

149,260

0.44

652

239,974

0.47

1,118

67,657

0.40

267


Lead


Tonnes

Pb

Contained Pb

Tonnes

Pb

Contained Pb

Tonnes

Pb

Contained Pb

Tonnes

Pb

Contained Pb

(x1000)

%

tonnes (x1000)

(x1000)

%

tonnes (x1000)

(x1000)

%

tonnes (x1000)

(x1000)

%

tonnes (x1000)

Olympias
2,618 4.8 125 10,319 5.0 520 12,937 5.0 645 2,186 6.5 142

Stratoni
0 0.0 0 1,351 6.1 82 1,351 6.1 82 1,700 6.2 106

TOTAL LEAD

2,618

4.80

125

11,670

5.2

602

14,288

5.1

727

3,886

6.4

248


Zinc


Tonnes

Zn

Contained Zn

Tonnes

Zn

Contained Zn

Tonnes

Zn

Contained Zn

Tonnes

Zn

Contained Zn

(x1000)

%

tonnes (x1000)

(x1000)

%

tonnes (x1000)

(x1000)

%

tonnes (x1000)

(x1000)

%

tonnes (x1000)

Olympias
2,618 5.7 150 10,319 6.6 682 12,937 6.4 831 2,186 7.3 158

Stratoni
0 0.0 0 1,351 8.7 117 1,351 8.7 117 1,700 9.3 158

TOTAL ZINC

2,618

5.7

150

11,670

6.8

799

14,288

6.6

948

3,886

8.1

316


Eldorado Gold Mineral Resources, as of September 30, 2021



Project



Measured Resources



Indicated Resources



Total Measured and Indicated



Inferred Resources



Gold


Tonnes

Au

Contained Au

Tonnes

Au

Contained Au

Tonnes

Au

Contained Au

Tonnes

Au

Contained Au

(x1000)

g/t

ounces (x1000)

(x1000)

g/t

ounces (x1000)

(x1000)

g/t

ounces (x1000)

(x1000)

g/t

ounces (x1000)

Bolcana
0 0.00 0 0 0.00 0 0 0.00 0 381,000 0.53 6,492

Certej
29,300 1.73 1,626 58,653 1.17 2,203 87,953 1.35 3,829 842 0.86 23

Efemcukuru
2,437 7.38 578 2,178 6.96 488 4,615 7.18 1,066 3,300 5.93 629

Kisladag
311,255 0.61 6,111 44,581 0.50 712 355,836 0.60 6,822 7,529 0.44 107

Lamaque
876 9.49 267 6,246 8.32 1,670 7,122 8.46 1,937 8,880 6.87 1,962

Ormaque
0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2,620 9.53 803

Olympias
2,343 10.66 803 10,905 7.43 2,606 13,248 8.00 3,409 2,092 8.41 566

Perama Hill
3,093 4.15 412 10,973 2.73 962 14,066 3.04 1,374 1,136 1.63 59

Perama South
0 0.00 0 0 0.00 0 0 0.00 0 14,870 1.52 728

Piavitsa
0 0.00 0 0 0.00 0 0 0.00 0 6,613 4.82 1,025

Sapes
0 0.00 0 0 0.00 0 0 0.00 0 3,434 7.43 820

Skouries
90,714 0.85 2,479 149,260 0.53 2,551 239,974 0.65 5,030 67,657 0.37 814

TOTAL GOLD

440,017

0.87

12,276

282,796

1.23

11,191

722,814

1.01

23,467

499,973

0.87

14,028


Silver


Tonnes

Ag

Contained Ag

Tonnes

Ag

Contained Ag

Tonnes

Ag

Contained Ag

Tonnes

Ag

Contained Ag

(x1000)

g/t

ounces (x1000)

(x1000)

g/t

ounces (x1000)

(x1000)

g/t

ounces (x1000)

(x1000)

g/t

ounces (x1000)

Certej
29,300 9 8,111 58,653 10 18,103 87,953 9 26,214 842 4 110

Olympias
2,343 149 11,203 10,905 142 49,841 13,248 143 61,043 2,092 179 12,070

Perama Hill
3,093 4 415 10,973 7 2,579 14,066 7 2,994 1,136 2 83

Piavitsa
0 0 0 0 0 0 0 0 0 6,613 54 11,389

Stratoni
0 0 0 1,351 153 6,647 1,351 153 6,647 1,700 162 8,866

TOTAL SILVER

34,736

18

19,729

81,882

29

77,170

116,618

26

96,898

12,383

82

32,518


Copper


Tonnes

Cu

Contained Cu

Tonnes

Cu

Contained Cu

Tonnes

Cu

Contained Cu

Tonnes

Cu

Contained Cu

(x1000)

%

tonnes (x1000)

(x1000)

%

tonnes (x1000)

(x1000)

%

tonnes (x1000)

(x1000)

%

tonnes (x1000)

Bolcana
0 0.00 0 0 0.00 0 0 0.00 0 381,000 0.18 686

Skouries
90,714 0.51 466 149,260 0.44 652 239,974 0.47 1,118 67,657 0.40 267

TOTAL COPPER

90,714

0.51

466

149,260

0.44

652

239,974

0.47

1,118

448,657

0.21

953


Lead


Tonnes

Pb

Contained Pb

Tonnes

Pb

Contained Pb

Tonnes

Pb

Contained Pb

Tonnes

Pb

Contained Pb

(x1000)

%

tonnes (x1000)

(x1000)

%

tonnes (x1000)

(x1000)

%

tonnes (x1000)

(x1000)

%

tonnes (x1000)

Olympias
2,343 4.8 113 10,905 4.8 527 13,248 4.8 640 2,092 5.9 124

Stratoni
0 0.0 0 1,351 6.1 82 1,351 6.1 82 1,700 6.2 106

TOTAL LEAD

2,343

4.81

113

12,256

5.0

609

14,599

4.9

722

3,792

6.1

230


Zinc


Tonnes

Zn

Contained Zn

Tonnes

Zn

Contained Zn

Tonnes

Zn

Contained Zn

Tonnes

Zn

Contained Zn

(x1000)

%

tonnes (x1000)

(x1000)

%

tonnes (x1000)

(x1000)

%

tonnes (x1000)

(x1000)

%

tonnes (x1000)

Olympias
2,343 5.7 134 10,905 6.4 701 13,248 6.3 835 2,092 7.1 149

Stratoni
0 0.0 0 1,351 8.7 117 1,351 8.7 117 1,700 9.3 158

TOTAL ZINC

2,343

5.7

134

12,256

6.7

818

14,599

6.5

952

3,792

8.1

307


Notes on Mineral Resources and Reserves

  1. Mineral Resources and Mineral Reserves are as of September 30, 2022
  2. The Mineral Resources and Mineral Reserves were classified using logic consistent with the CIM Definition Standards for Mineral Resources & Mineral Reserves (2014) incorporated, by reference, into National Instrument 43-101 –

    Standards of Disclosure for Mineral Projects

    (“NI 43-101”).
  3. Mineral Reserves are included in the Mineral Resources.
  4. The Mineral Resources and Mineral Reserves are disclosed on a total project basis.

Mineral resources which are not mineral reserves do not have demonstrated economic viability. With respect to “inferred mineral resources”, there is a great amount of uncertainty as to their existence and a great uncertainty as to their economic and legal feasibility. It cannot be assumed that all or any part of an “indicated mineral resource” or “inferred mineral resource” will ever be upgraded to a higher category.


Cautionary Note to US Investors Concerning Estimates of Measured, Indicated and Inferred Resources


There are differences between the standards and terms used for reporting mineral reserves and resources in Canada, and in the United States pursuant to the United States Securities and Exchange Commission’s (the “SEC”). The terms mineral resource, measured mineral resource, indicated mineral resource and inferred mineral resource are defined by the Canadian Institute of Mining, Metallurgy and Petroleum (CIM) and the CIM Definition Standards on Mineral Resources and Mineral Reserves adopted by the CIM Council, and must be disclosed according to Canadian securities regulations.

These standards differ from the requirements of the SEC applicable to domestic United States reporting companies. Accordingly, information contained in this news release with respect to mineral deposits may not be comparable to similar information made public by United States companies subject to the SEC’s reporting and disclosure requirements.


Mineral Reserve Notes

Eldorado reports Mineral Reserves in accordance with CIM Definition Standards. All Mineral Reserves are determined using a long-term gold price ($1,300/oz). A reserve test is undertaken every year to confirm future undiscounted cash flow from reserve mine plan is positive.


1.

Long-Term Metal Price Assumptions

  • Gold price: $1,300/oz
  • Silver price: $17.00/oz
  • Copper price: $2.75/lb
  • Lead price: $2,000/t
  • Zinc price: $2,400/t


2.



Cut-off Grades


Certej: 0.90 g/t Au Equivalent grade (=Au(g/t)+Ag(g/t)*0.0121); Efemcukuru: $104.00/t NSR (long hole stoping), $108.00/t NSR (drift and fill); Kisladag: 0.18 g/t Au Recoverable; Lamaque: 4.69 g/t Au; Olympias: $195.00/t NSR; Perama Hill: 0.73 g/t Au; Skouries: $10.60/t NSR (open pit), $33.33/t NSR (underground).


3.

Qualified Persons


The following persons, all of whom are qualified persons under NI 43-101, have approved the disclosure contained within this release:


Asset

Mining Type(s)

Qualified Person

Company
Efemcukuru Underground Terry Cadrin, P.Eng., Director, Business Planning and LOM Evaluations Eldorado Gold
Kisladag Open Pit Terry Cadrin, P.Eng., Director, Business Planning and LOM Evaluations Eldorado Gold
Lamaque Underground Jessy Thelland, géo (OGQ No. 758)., Technical Services Director Lamaque Eldorado Gold
Olympias Underground Victor Vdovin, P.Eng., Head of Mining Greece Eldorado Gold
Skouries Open Pit Terry Cadrin, P.Eng., Director, Business Planning and LOM Evaluations Eldorado Gold
Skouries Underground Gary Methven, P.Eng., Underground Manager / Principal Mining Engineer AMC Mining Consultants
Perama Hill Open Pit Terry Cadrin, P.Eng., Director, Business Planning and LOM Evaluations Eldorado Gold
Certej Open Pit Terry Cadrin, P.Eng., Director, Business Planning and LOM Evaluations Eldorado Gold



Mineral Resource Notes

Eldorado reports Mineral Resources in accordance with CIM Definition Standards. All Mineral Resources are assessed for reasonable prospects for eventual economic extraction (RPEEE). The Resource cut-off grades or values (e.g. gold equivalent) are determined using a long-term gold price ($1,800/oz) and modifying factors derived in the resource to reserve conversion process (or by comparison to similar projects for our resource-only properties). These values are then used to create constraining volumes that provide limits to the reported Resources. Open Pit Resources used pit shells created with the long-term gold price to constrain reportable model blocks. Underground Resources were constrained by volumes whose design was guided by a combination of the reporting cut-off grade or value, contiguous areas of mineralization and mineability. Eldorado’s Mineral Resources are inclusive of Reserves.


1.



Long-Term Metal Price Assumptions:

  • Gold price: $1,800/oz
  • Silver price: $24/oz
  • Copper price: $3.25/lb
  • Lead price: $2,200/t
  • Zinc price: $2,600/t


2.



Mineral Resource Reporting and demonstration of Reasonable Prospects for Eventual Economic Extraction:


The Mineral Resources used a long term look gold metal price of $1,800/oz for the determination of resource cut-off grades or values. This guided execution of the next step where constraining surfaces or volumes were created to control resource reporting. Open pit-only projects (Kisladag, Perama Hill, Perama South, and Certej) used pit shells created with the long-term gold price to constrain reportable model blocks. Underground Resources were constrained by 3D volumes whose design was guided by the reporting cut-off grade or value, contiguous areas of mineralization and mineability. Only material internal to these volumes were eligible for reporting. Projects with both open pit and underground resources have the open pit Resources constrained by either the permit (Skouries), and pit shell, or by an open pit/underground economic crossover surface (Bolcana), and underground Resources constrained by a reporting shape.


3.



Cut-off Grades


Bolcana: 0.30 g/t Au Equivalent grade (open pit), 0.65 g/t Au Equivalent grade (underground) (=Au g/t + 1.27*Cu%); Certej: 0.60 g/t Au; Efemcukuru: 2.5 g/t Au; Kisladag: 0.25 g/t Au; Lamaque: 3.0 g/t Au; Ormaque: 3.5 g/t Au; Olympias: $125/t NSR; Perama Hill and Perama South: 0.50 g/t Au; Piavitsa: 4.0 g/t Au; Sapes: 2.5 g/t Au (underground), 1.0 g/t Au (open pit); Skouries: 0.30 g/t Au Equivalent grade (open pit), 0.70 g/t Au Equivalent grade (underground) (=Au g/t + 1.25*Cu%); Stratoni: $200/t NSR.


4.



Qualified Persons

The following persons, all of whom are qualified persons under NI 43-101, have approved the disclosure contained within this release:


Asset

Mining Type(s)

Qualified Person

Company
Efemcukuru Underground Ertan Uludag, P.Geo., Manager, Resource Geology Eldorado Gold
Kisladag Open Pit Ertan Uludag, P.Geo., Manager, Resource Geology Eldorado Gold
Lamaque Underground Jessy Thelland, géo (OGQ No. 758)., Technical Services Director Lamaque Eldorado Gold
Ormaque Underground Jessy Thelland, géo (OGQ No. 758)., Technical Services Director Lamaque Eldorado Gold
Olympias Underground Ertan Uludag, P.Geo., Manager, Resource Geology Eldorado Gold
Skouries Open Pit Sean McKinley, P.Geo., Manager, Mine Geology & Reconciliation Eldorado Gold
Skouries Underground Sean McKinley, P.Geo., Manager, Mine Geology & Reconciliation Eldorado Gold
Perama Hill Open Pit Sean McKinley, P.Geo., Manager, Mine Geology & Reconciliation Eldorado Gold
Perama South Open Pit Sean McKinley, P.Geo., Manager, Mine Geology & Reconciliation Eldorado Gold
Piavitsa Underground Sean McKinley, P.Geo., Manager, Mine Geology & Reconciliation Eldorado Gold
Sapes Underground and Open Pit Sean McKinley, P.Geo., Manager, Mine Geology & Reconciliation Eldorado Gold
Stratoni Underground Ertan Uludag, P.Geo., Manager, Resource Geology Eldorado Gold
Certej Open Pit Sean McKinley, P.Geo., Manager, Mine Geology & Reconciliation Eldorado Gold




Note Regarding Mineral Reserve and Mineral Resources:


All Mineral Reserves and Mineral Resources have been estimated in accordance with the standards of the Canadian Institute of Mining, Metallurgy and Petroleum (“CIM”) and NI 43-101. Sample preparation, analytical techniques, laboratories used, and quality assurance and quality control protocols used during exploration drilling programs are done consistent with industry standards while independent certified assay labs are used. Additional information on the mineral properties mentioned in this news release that are considered to be material mineral properties to the Company are contained in Eldorado’s annual information form for the year ended December 31, 2021 and the following technical reports for each of those properties, all of which are available under the Company’s profile at



www.sedar.com



and www.sec.gov:


  • Technical report entitled “Technical Report, Kisladag Gold Mine, Turkiye” with an effective date of January 17, 2020.

  • Technical report entitled “Technical Report, Efemcukuru Gold Mine, Turkiye” with an effective date of December 31, 2019.

  • Technical report entitled “Technical Report, Olympias Mine, Greece” with an effective date of December 31, 2019.

  • Technical report entitled “Technical Report, Skouries Project, Greece” with an effective date of January 22, 2022.

  • Technical report entitled “Technical Report, for the Lamaque Project, Quebec, Canada’” with an effective date of December 31, 2021.



Cautionary Note about Forward-looking Statements and Information


Certain of the statements made and information provided in this press release are forward-looking statements or information within the meaning of the United States Private Securities Litigation Reform Act of 1995 and applicable Canadian securities laws. Often, these forward-looking statements and forward-looking information can be identified by the use of words such as “anticipates”, “believes”, “budget”, “continue”, “estimates”, “expects”, “forecasts”, “foresee”, “future”, “goal”, “guidance”, “intends”, “opportunity”, “outlook”, “plans”, “potential”, “strive”, “target” or “underway” or the negatives thereof or variations of such words and phrases or statements that certain actions, events or results “can”, “could”, “likely”, “may”, “might”, “will” or “would” be taken, occur or be achieved.


Forward-looking statements or information contained in this release include, but are not limited to, statements or information with respect to: our mineral reserves and mineral resources; the sale of the Certej project; our expectation as to our future financial and operating performance, including future cash flow, estimated cash costs, expected metallurgical recoveries and gold price outlook; and our strategy, plans and goals, including our proposed exploration, development, construction, permitting and operating plans and priorities, related timelines and schedules. Forward-looking statements and forward-looking information by their nature are based on assumptions and involve known and unknown risks, uncertainties and other factors, which may cause the actual results, performance or achievements of the Company to be materially different from any future results, performance or achievements expressed or implied by such forward-looking statements or information.


We have made certain assumptions about the forward-looking statements and information, including assumptions about: ability to obtain all required approvals and permits; changes in input costs, exchange rates, development and gold; the geopolitical, economic, permitting and legal climate that we operate in; our preliminary gold production and our guidance, benefits of the completion of the decline at Lamaque, the improvements at Kisladag and the optimization of Greek operations; tax expenses in Turkiye; how the world-wide economic and social impact of COVID-19 is managed and the duration and extent of the COVID-19 pandemic; timing, cost and results of our construction and exploration; the geopolitical, economic, permitting and legal climate that we operate in; the future price of gold and other commodities; the global concentrate market; exchange rates; anticipated values, costs, expenses and working capital requirements; production and metallurgical recoveries; mineral reserves and resources; and the impact of acquisitions, dispositions, suspensions or delays on our business and the ability to achieve our goals. In addition, except where otherwise stated, we have assumed a continuation of existing business operations on substantially the same basis as exists at the time of this release.


Even though our management believes that the assumptions made and the expectations represented by such statements or information are reasonable, there can be no assurance that the forward-looking statement or information will prove to be accurate. Many assumptions may be difficult to predict and are beyond our control.


Furthermore, should one or more of the risks, uncertainties or other factors materialize, or should underlying assumptions prove incorrect, actual results may vary materially from those described in forward-looking statements or information. These risks, uncertainties and other factors include, among others


,


the following: inability to meet production guidance; inability to achieve the expected benefits of the completion of the decline at Lamaque, the improvements at Kisladag and the optimization of Greek operations; inability to assess income tax expenses in Turkiye; risks relating to the ongoing COVID-19 pandemic and any future pandemic, epidemic, endemic or similar public health threats; risks relating to our operations being located in foreign jurisdictions; community relations and social license; climate change; liquidity and financing risks; development risks; indebtedness, including current and future operating restrictions, implications of a change of control, ability to meet debt service obligations, the implications of defaulting on obligations and change in credit ratings; environmental matters; waste disposal; the global economic environment; government regulation; reliance on a limited number of smelters and off-takers; commodity price risk; mineral tenure; permits; risks relating to environmental sustainability and governance practices and performance; non-governmental organizations; corruption, bribery and sanctions; litigation and contracts; information technology systems; estimation of mineral reserves and mineral resources; production and processing estimates; credit risk; actions of activist shareholders; price volatility, volume fluctuations and dilution risk in respect of our shares; reliance on infrastructure, commodities and consumables; currency risk; inflation risk; interest rate risk; tax matters; dividends; financial reporting, including relating to the carrying value of our assets and changes in reporting standards; labour, including relating to employee/union relations, employee misconduct, key personnel, skilled workforce, expatriates and contractors; reclamation and long-term obligations; regulated substances; necessary equipment; co-ownership of our properties; acquisitions, including integration risks, and dispositions; the unavailability of insurance; conflicts of interest; compliance with privacy legislation; reputational issues; competition, as well as those risk factors discussed in the sections titled “Forward-looking information and risks” and “Risk factors in our business” in our most recent Annual Information Form & Form 40-F. The reader is directed to carefully review the detailed risk discussion in our most recent Annual Information Form & Form 40-F filed on SEDAR and EDGAR under our Company name, which discussion is incorporated by reference in this release, for a fuller understanding of the risks and uncertainties that affect our business and operations.


The inclusion of forward-looking statements and information is designed to help you understand management’s current views of our near- and longer-term prospects, and it may not be appropriate for other purposes.


There can be no assurance that forward-looking statements or information will prove to be accurate, as actual results and future events could differ materially from those anticipated in such statements. Accordingly, you should not place undue reliance on the forward-looking statements or information contained herein. Except as required by law, we do not expect to update forward-looking statements and information continually as conditions change and you are referred to the full discussion of the Company’s business contained in the Company’s reports filed with the securities regulatory authorities in Canada and the United States.



Qualified Person


Except as otherwise noted, Simon Hille, FAusIMM, Senior Vice President, Technical Services, is the Qualified Person under NI 43-101 responsible for preparing and supervising the preparation of the scientific or technical information contained in this news release and verifying the technical data disclosed in this document relating to our operating mines and development projects. Jessy Thelland, géo (OGQ No. 758)., Director Technical Services Lamaque, a member in good standing of the Ordre des Géologues du Québec, is the qualified person as defined in NI 43-101 responsible for, and has verified and approved, the scientific and technical disclosure contained in this press release for the Quebec projects.